Thury is visiting customers in Germany today
Etienne is visiting customers in Belgien
Fit4Work - Soccer takes place on Wednesday
08.00 am Greenteam meeting
1 pm Technical meeting
- MOS production capacity utilization week 03 = 103%, week 02 = 95%, week 51 = 83%, week 50 = 100%
- MOS productivity welding shop week 03 = 113%, week 02 = 91%, week 51 = 86%, week 50 = 95%
- MOC production capacity utilization week 03 = ??, week 02 = 44%, week 51 = 62%, week 50 = 72%
- Order situation assembly 3,250 DG, 560 DK/LAN, 251 FL
- 223. Container to the USA will be loaded on Wed 01/21/26
- 53rd container to Canada will be loaded on Thu 01/22/26
- Barbecue party 09/11/26
- MOS production capacity utilization CW 02 = 95%, CW 51 = 83%, CW 49 = 102%, CW 48 = 69%
- MOS productivity welding shop CW 02 = 91%, CW 51 = 86%, CW 50 = 95%, week 49 = 90%
- MOC production capacity utilization week 02 = xx%, week 51 = 62%, week 50 = 72%, week 49 = 81%
- Order situation assembly 3500 DG, 615 DK/LAN, 531 FL
- Disposal of important files: On Tue, Jan. 20th, 2026, from 9:00 a.m. to 11:00 a.m., a pallet frame will be in front of the sales office
- MOS production capacity utilization week 51 = 83%, week 50 = 100%, week 49 = 102%, week 48 = 69%
- MOS productivity welding shop week 51 = 86%, week 50 = xx%, week 49 = 90%, week 48 = 99%
- MOC production capacity utilization week 51 = 62%, week 50 = 72%, week 49 = 81%, week 48 = 52%
- Order situation assembly 850 DG, 202 DK/LAN, 145 FL
- 223. Container to the USA will be loaded on Wed, Jan 21, 2026
- Thomas Klumpp (Sales) has passed his probationary period
- Departures: Sonja Räbsamen, Feb 28th, 2026, and Levis Wanjiru, Jan 31st, 2026
- MOS production capacity utilization week 50 = 100%, week 49 = 102%, week 48 = 69%, week 47 = 74%
- MOS productivity welding shop week 50 = xx%, week 49 = 90%, week 48 = 99%, week 47 = 100%
- MOC production capacity utilization week 50 = 72%, week 49 = 81%, week 48 = 52%, week 47 = 42%
- Order situation Assembly 420 DG, 26 DK/LAN, 48 FL
- 16th and 17th December 2025 MOS raw material
- Andreas Bühler (Logistics) and Rita Walliser (Quality) have passed their probationary period.
- ASGA Pension Fund: Encouraging performance in 2025, retirement assets earn 5.5% interest.
- Departmental targets for 2026 soon available at information points
- MOS production capacity utilization week 49 = 102%, week 48 = 69%, week 47 = 74%, week 46 = 82%
- MOS productivity welding shop week 49 = 90%, week 48 = 99%, week 47 = 100%, week 46 = 116%
- MOC production capacity utilization week 49 = 81%, week 48 = 52%, week 47 = 42%, week 46 = 50%
- Order situation Assembly 5,000 DG, 630 DK/LAN, 639 FL
- 8th and 9th December 2025 MOS basement inventory / 11th, 12th and 15th December 2025 MOS assembly inventory
- 222. Container to the USA will be loaded on Wednesday, 10 December 2025.
- Andreas Räbsamen, Production Setter, probationary period passed
- Public holidays and long weekends / Occasions, new 2026 list at information points
- MOS production capacity utilization week 48 = 69%, week 47 = 74%, week 46 = 82%, week 45 = 110%
- MOS productivity welding shop week 48 = 99%, week 47 = 100%, week 46 = 116%, week 45 = 89%
- MOC production capacity utilization week 48 = 52%, CW 47 = 42%, CW 46 = 50%, CW 45 = 62%
- Order situation Assembly 2,200 DG, 578 DK/LAN, 162 FL
- 2+3.12.25 Inventory MOC, 4+5.12.25 Inventory MOS welding shop
- New employees: January 1, 2026 Daniel Rutz, Logistics/Driver and Efrem Samiel Assembly Employee
- New employee: February 1, 2026 Aklilu Mheretab, Assembly Employee
- Please RSVP for the Christmas dinner by December 5, 2025.
- MOS production capacity utilization week 47 = 74%, week 46 = 82%, week 45 = 110%, week 44 = 99%
- MOS productivity welding shop week 47 = 100%, week 46 = 116%, week 45 = 89%, week 44 = 87%
- MOC production capacity utilization week 47 = 42%, week 46 = 50%, week 45 = 62%, week 44 = 76%
- Order situation assembly 3,200 DG, 199 DK/LAN, 138 FL
- 26.11.25 Start inventory MOS external warehouse
- 27th and 28th November 25 Start inventory MAU
- Lubova EV-Matic 200 flyers (cable solution for electric charging stations) are available in the canteen.
- MOS production capacity utilization week 46 = 82%, week 45 = 110%, week 44 = 99%, week 43 = 112%
- MOS productivity welding shop week 46 = 116%, week 45 = 89%, week 44 = 87%, week 43 = 109%
- MOC production capacity utilization week 46 = 50%, week 45 = 62%, week 44 = 76%, week 43 = 81%
- Order situation assembly 2,100 DG, 417 DK/LAN, 88 FL
- Holiday planning for 2026, submit holiday requests by 16 January 2026
- Apprenticeship contracts 2026; Selina Bösch, commercial clerk EFZ, Xhemail Sherifi, production mechanic EFZ
- MOS production capacity utilization week 45 = 110%, week 44 = 99%, week 43 = 112%, week 42 = 106%
- MOS productivity welding shop week 45 = 89%, week 44 = 87%, week 43 = 109%, week 42 = 105%
- MOC production capacity utilization week 45 = 62%, week 44 = 76%, week 43 = 81%, CW 42 = 69%
- Order situation assembly 1,650 DG, 490 DK/LAN, 123 FL - Last massage morning 11/25/25, first in the new year 1/13/26
- Wed 11/12 and Thu 11/13/25 Inventory MCA
- MOS production capacity utilization week 44 = 99%, week 43 = 112%, week 42 = 106%, week 41 = 88%
- MOS productivity welding shop week 44 = 87%, week 43 = 109%, week 42 = 105%, week 41 = 88%
- MOC production capacity utilization week 44 = 76%, week 43 = 81%, week 42 = 69%, week 41 = 64%
- Order situation assembly 2,850 DG, 1,000 DK/LAN, 139 FL
- 52. Container to Canada will be loaded on Friday, November 7, 2025
– 221. Container to the USA will be loaded on Monday, November 10, 2025
– Eliza Celenk, Eric Stalder, and Spenta Ibrahim have passed their probationary period
- MOS production capacity utilization week 43 = 112%, week 42 = 106%, week 41 88%, week 40 = 104%
- MOS productivity welding shop week 43 = 109%, week 42 = 105%, week 41 88%, week 40 = 106%
- MOC production capacity utilization week 43 = 81%, week 42 = 69%, week 41 = 64%, week 40 = 50%
- Order situation assembly 1,563 DG, 345 DK/LAN, 169 FL
- Larina Weiler, Marketing Group Manager, has passed her probationary period.
- From the suggestion box; laser marking tool dispenser implemented
- MOS production capacity utilization week 42 = 106%, week 41 88%, week 40 = 104%, week 39 = 102%
- MOS productivity welding shop week 42 = 105%, week 41 88%, week 40 = 106%, week 39 = 111%
- MOC production capacity utilization week 42 = 69%, week 41 = 64%, week 40 = 50%, week 39 = 60%
- Order situation assembly 1,393 DG, 620 DK/LAN, 63 FL
- National Future Day Thursday, November 13, 2025, registration deadline November 5, 2025, contact Pia
- Departures MOS: Siro Manser as of October 23, 2025, and Elyas Beyene as of December 31, 2025
- Joining MOC: Jimmy Ellis, Warehouse Manager as of October 20, 2025
- MOS production capacity utilization week 41 88%, week 40 = 104%, week 39 = 102%, week 38 = 80%
- MOS productivity welding shop week 41 88%, week 40 = 106%, week 39 = 111%, week 38 = 117%
- MOC production capacity utilization week 64%, week 40 = 50%, week 39 = 60%, week 38 = 64%
- Order situation assembly 1,150 DG, 414 DK/LAN, 21 FL
- Preparation for your MFG, think about your training needs and your development wishes/ideas
- MOS production capacity utilization week 40 = 104%, week 39 = 102%, week 38 = 80%, week 37 = 114%
- MOS productivity welding shop week 40 = 106%, week 39 = 111%, week 38 = 117%, week 37 = 112%
- MOC production capacity utilization week 40 = ??%, week 39 = 60%, week 38 = 64%, CW 37 =77%
- Order situation assembly 1,250 DG, 560 DK/LAN, 149 FL
- 220. Container to the USA will be loaded on Wed 8.10.25
- Pia Thoma, HR/Vocational Training, probation period passed
- Organisational charts as of 1.10.25, available at info points and on Bäumli from Thursday
- October 14, 2025, 10:00 a.m., refresher training on cybercrime, please note the attendance list at info points
- MOS production capacity utilization week 39 = 102%, week 38 = 80%, week 37 = 114%, week 36 = 93%
- MOS productivity welding shop week 39 = 111%, week 38 = 117%, week 37 = 112%, week 36 = 100%
- MOC production capacity utilization week 60%, week 38 = 64%, week 37 = 77%? KW 36 = 76%
- Order situation assembly 2,500 DG, 649 DK/LAN, 249 FL
- Guest brochure (hotels, restaurants in the area) coming soon to Bäumli
- October 2nd to 4th, 2025, MES, Spain branch, celebrates opening
- October 14th, 2025, 10:00 a.m., refresher training on cybercrime, see attendance list at info points from Wednesday onwards
– Andras Béres, Area Sales Manager, leaving on October 31st, 2025
- MOS production capacity utilization week 38 = 80%, week 37 = 114%, week 36 = 93%, week 35 = 83%
- MOS productivity welding shop week 38 = 117%, week 37 = 112%, week 36 = 100%, week 35 = 111%
- MOC production capacity utilization week 38 = 64%, week 37 = 77%, week 36 = 76%, week 35 = 70%
- Order situation assembly 4,500 DG, 700 DK/LAN, 163 FL
- 54th container to Australia will be loaded on Wed, Sep 24, 25
- MOS production capacity utilization CW 37 = 114%, CW 36 = 93%, CW 35 = 83%, CW 34 = 83%
- MOS productivity welding shop CW 37 = 112%, CW 36 = 100%, CW 35 = 111%, CW 34 = 91%
- MOC production capacity utilization week 37 = 77%, week 36= 76%, week 35 = 70%, week 34 = 50%
- Open orders Assembly 2,500 DG, 323 DK/LAN, 120 FL
- Thu 18 Sept Refresher course on cybercrime and AI, please check the list of participants for ALL employees
- Tue 23 Sept Supplier audit by WashTec – please wear ALL MOS clothing
- Tue 23 Sept & Thu 25 Sept Career guidance in the afternoons
- Thu 26 Feb 2026 Internal audit MOS 2026
- MOS production capacity utilization CW 36 = 93%, CW 35 = 83%, CW 34 = 83%, CW 33 = 124%
- MOS productivity welding shop CW 36 = 100%, CW 35 = 111%, CW 34 = 91%, CW 33 = 100%
- MOC production capacity utilization week 36= 76%, week 35 = 70%, week 34 = 50%, week 33 = 60%
- Open orders Assembly 1,047 DG, 333 DK/LAN, 103 FL
- Thu 11 Sept Raiffeisenbank Young Entrepreneurs event, canteen full 6–10 p.m.
- Thu 18 Sept Refresher course on cybercrime and AI, please check the list of participants for ALL employees
- Joined MOC; Assembly of 6 September 2025, Samantha Edmonds
- Joined MOS; QM employee as of 1 October 2025, Rita Walliser
- MOS production capacity utilization CW 35 = 83%, CW 34 = 83%, CW 33 = 124%, CW 32 = 112%
- MOS productivity welding shop CW 35 = 111%, CW 34 = 91%, CW 33 = 100%, CW 32 = 134%
- MOC production capacity utilization week 35 = 70%, week 34 = 50%, week 33 = 60%, week 32 = 73%
- Open orders Assembly 1,335 DG, 360 DK/LAN, 150 FL
- 219. Container to the USA will be loaded on Wednesday, 3 September 2025.
- Joined MAU; Regional Sales Manager as of 1 September 2025, Ben Rodgers
- Joined MOS; IT Supporter as of 1 January 2026, Lukas Birchler
- MOS production capacity utilization CW 34 = 83%, CW 33 = 124%, CW 32 = 112%, CW 31 = 80%
- MOS productivity welding shop CW 34 = ??, CW 33 = ?, CW 32 = 134%, week 31 = 125%
- MOC production capacity utilization week 34 = 50%, week 33 = 60%, week 32 = 73%, week 31 = 79%
- Open orders Assembly 1,600 DG, 541 DK/LAN, 56 FL
- Caren Barros, assembly and cleaning, has passed her probationary period.
- Admission to MOC Assembly as of August 25, 2025 Katelynn Counts and Joshua Williams
- MOS Production employee joining on September 1, 2025, Andreas Räbsamen
- MOS production capacity utilization CW 33 = 124%, CW 32 = 112%, CW 31 = 80%, CW 30 = 107%
- MOS productivity welding shop CW 33 = ?, CW 32 = 134%, week 31 = 125%, week 30 = 96%
- MOC production capacity utilization week 33 = 60%, week 32 = 73%, week 31 = 79%, week 30 = 77%
- Open orders Assembly 2,000 DG, 210 DK/LAN, 225 FL
- Container to the USA for Barens 350 FL will be loaded on Thu 21.8.25
- 51. Container CAN was loaded on Mon 18.8.25
- MOS production capacity utilization CW 32 = 112%, CW 31 = 80%, CW 30 = 107%, CW 29 = 108%
- MOS productivity welding shop CW 32 = 134%, week 31 = 125%, week 30 = 96%, week 29 = 90%
- MOC production capacity utilization week 32 = 73%, week 31 = 79%, week 30 = 77%, CW 29 = 63%
- Open orders Assembly 2,600 DG, 699 DK/LAN, 541 FL
- Container to the USA for Barens 350 FL will be loaded on Fri 15.8.25
- Prize presentation Competition winners Apprenticeship forum incl. tour Wed 13.8.25
- Entry Temporary help for Tue afternoon Assembly, Tim Niederer from 19.8.25
- Kitti Toth, assembly, has passed her probationary period
- IT security training on cybercrime and AI, Thu 18.9.25
- MOS production capacity utilization week 31 = 80%, week 30 = 107%, week 29 = 108%, week 28 = 77%
- MOS welding productivity week 31 = 125%, week 30 = 96%, week 29 = 90%, week 28 = 79%
- MOC production capacity utilization week 31 = 79%, week 30 = 77%, week 29 = ?? %, CW 28 = 68%
- Open assembly orders 3,700 DG, 177 DK/LAN, 261 FL
- 218. Container to the US will be loaded on Wed, Aug 6, 25.
- Joined MOS on August 4, 2025: Eric Stalder, apprentice polymechanic
- Joined MOS on October 1, 2025: Andreas Bühler, Logistics Team Leader
- Payday Tue, Aug 26, 2025
Thank you to everyone involved for their outstanding efforts with the Vulcan swivel joint and during the power outage.
- MOS production capacity utilization week 30 = 107%, week 29 = 108%, week 28 = 77%, week 27 = 84%
- MOS welding productivity week 30 = 96%, week 29 = 90%, week 28 = 79%, week 27 = 99%
- MOC production capacity utilization week 30 = 77%, week 29 = ?? %, CW 28 = 68%, CW 27 = 60%
- Open assembly orders 3,100 DG, 291 DK/LAN, 99 FL
- Please be careful when transporting pallets (floor damage)
- Joining MOC 28.07.2025: Angela Knight, Assembly
- Leaving MOS 08.08.2025: Reto Gmür, Apprentice Polymechanic
- Transferring MOS 01.09.2025: Gerta Shala, Internal Sales
Add: Entry 04.08.2025 Eric Stalder, apprentice polymechanic
- MOS Production capacity utilization week 29 = 108%, week 28 = 77%, week 27 = 84%, week 26 = 78%
- MOS Welding shop productivity week 29 = 90%, week 28 = 79%, week 27 = 99%, week 26 = 113%
- MOC Production capacity utilization week 29 = ??%, week 28 = 68%, week 27 = 60%, week 26 = 59%
- Open orders assembly 1'200 DG, 210 DK/LAN, 79 FL
- Mi 27.08.25, 9:00 a.m., employee information regarding construction project building A
- MOS production capacity utilization week 28 = 77%, week 27 = 84%, week 26 = 78%, week 25 = 117%
- MOS welding shop productivity week 28 = 79%, week 27 = 99%, week 26 = 113%, week 25 = 98%
- MOC production capacity utilization week 28 = 68%, week 27 = 60%, week 26 = 59%, week 25 = 65%
- Open orders assembly 2,100 DG, 340 DK/LAN, 135 FL
- 17.7.25 Submission of building permit for construction A, visors are then placed on the roof
- MOS production capacity utilization week 27 = 84%, week 26 = 78%, week 25 = 117%, week 24 = 108%
- MOS welding shop productivity week 27 = 99%, week 26 = 113%, week 25 = 98%, week 24 = 108%
- MOC production capacity utilization week 27 = 60%, week 26 = 59%, week 25 = 65%, week 24 = 89%
- Open assembly orders 1,700 DG, 382 DK/LAN, 133 FL
- 14.11.2025 No power in the afternoon (SAK maintenance work)
Addendum:
- Entry of assembly employees as of 01.08.2025 Siro Manser
- MOS Production capacity utilization week 26 = 78%, week 25 = 117%, week 24 = 108%, week 23 = 123%
- MOS Welding shop productivity week 26 = 113%, week 25 = 98%, week 24 = 108%, week 23 = 123%
- MOC Production capacity utilization week 26 = 59%, week 25 = 65%, week 24 = 89%, week 23 = 99%
- Open assembly orders 4,100 DG, 617 DK/LAN, 327 FL
- 217. Container to the USA will be loaded on Wed 2.7.25
- Leaving: Andreas Senn, Assembly, 30.06.25
- Entry: Niklas Hasler, Marketing Temporary Staff, 1.7.25
- Entry: Pia Thoma, HR/Apprentice Manager, 7.7.25
- Entry: Thomas Klumpp, Sales Representativ, 1.10.25
- MOS production capacity utilization week 25 = 117%, week 24 = 108%, week 23 = 123%, week 22 = 153%
- MOS welding productivity week 25 = 98%, week 24 = 108%, week 23 = 123%, week 22 = 125%
- MOC production capacity utilization week 25 = 65%, week 24 = 89%, week 23 = 99%, week 22 = 95%
- Open orders assembly 2,000 DG, 203 DK/LAN, 253 FL
- There are now 10 production machines connected to the network
- Apprenticeship graduates Congratulations on Thu 26. 6.25 in the canteen
- Fiirobig meeting on Fri. 27.6.25 at MOS
- MOS production capacity utilization week 24 = 108%, week 23 = 123%, week 22 = 153%, week 21 = 128%
- MOS Welding productivity week 24 = 108%, week 23 = 123%, week 22 = 125%, week 21 = 112%
- MOC production capacity utilization week 24 = xx%, week 23 = 99%, week 22 = 95%, week 21 = 89%
- Open assembly orders 3,900 DG, 682 DK/LAN, 261 FL
- Canteen remains closed in week 30 + 31, 21.7. - 1.8.25, MA kitchen open
- No shift operation in week 30 + 31
- Peter Schrag, Logistics, temporary Stalder driver, Tue - Fri mornings
- MOS production capacity utilization week 23 = xx%, week 22 = 153%, week 21 = 128%, week 20 = 130%
- MOS welding productivity week 23 = xx%, week 22 = 125%, week 21 = 112%, week 20 = 124%
- MOC production capacity utilization week 23 = xx%, week 22 = 95%, week 21 = 112%, week 20 = 80%
- Open assembly orders 1,200 DG, 350 DK/LAN, 165 FL
- Production employees joining on 16.06.2025, Khaled Saidi
- MOS Production capacity utilization week 22 = 153%, week 21 = 128%, week 20 = 130%, week 19 = 135%
- MOS Welding shop productivity week 22 = 125%, week 21 = 112%, week 20 = 124%, week 19 = 110%
- MOC Production capacity utilization week 22 = 95%, week 21 = 112%, week 20 = xx%, week 19 = 87%
- Open orders assembly 3'700 DG, 406 DK/LAN, 231 FL
- 216. Container to the USA will be loaded on Wed 4.6.25
- Inventory MCA on Wed 4.6. and Thu 5.6.25
- Levis Wanjiru, Assembly, has passed the probationary period
- Entry of Group Head of Marketing as of 01.08.2025, Larina Weiler
- MOS production capacity utilization week 21 = 128%, week 20 = 130%, week 19 = 135%, week 18 = 96%
- MOS welding productivity week 21 = 112%, week 20 = 124%, week 19 = 110%, week 18 = 126%
- MOC production capacity utilization week 21 = xx%, week 20 = xx%, week 19 = 87%, week 18 = 87%
- Open orders for assembly 3,000 DG, 405 DK/LAN, 310 FL
- 52nd container to Australia will be loaded on Wed 28.5.25
- Next ISO 9001 & 14001 monitoring audit on 26.03.2026
- TVO, local TV will film the “Mini Firma” format at our premises on Thu 5.6.25
- Luca Rossi, MCA joins us on 15.5.2025 / Luke Blair, MOC leaves us on 23.5.2025
- MOS production capacity utilization week 20 = 130%, week 19 = 135%, week 18 = 96%, week 17 = 131%
- MOS welding productivity week 20 = 124%, week 19 = 110%, week 18 = 126%, week 17 = 94%
- MOC production capacity utilization week 20 = xx%, week 19 = 87%, week 18 = 87%, week 17 = 79%
- Open assembly orders 4,500 DG, 630 DK/LAN, 293 FL
- English courses to continue from summer, interested parties should contact Céline
- Apprenticeship forum Wattwil on Sat 14.6.2025
- Florent Mustafa leaves the company on 31.7.2025
- MOS production capacity utilization week 19 = 135%, week 18 = 96%, week 17 = 131%, week 16 = 106%
- MOS Welding productivity week 19 = 110%, week 18 = 126%, week 17 = 94%, week 16 112%
- MOC production capacity utilization week 19 = 87%, week 18 = 87%, week 17 = 79%, week 16 = 83%, week 15 = 91%
- Open orders Assembly 3,200 DG, 550 DK/LAN, 250 FL
- 50th container to Canada will be loaded on Fri 05-16-25
-Organizational charts as of 1.5.2025 soon at info points and on Bäumli
- MOS production capacity utilization KW 18 = 96%, KW 17 = 131%, KW 16 = 106%, KW 15 = 139%
- MOS Welding productivity KW 18 = 126%, KW 17 = 94%, KW 16 112%, KW 15 =103%
- MOC production capacity utilization KW18 = 87%, KW 17 = 79%, KW 16 = 83%, KW 15 =91%
- Open assembly orders 2,600 DG, 1,001 DK/LAN, 278 FL
- 215th container to the USA will be loaded on Wed 7.5.25
- Coffee fund dinner 9.5.25 with best Mosmaticer, see group assignments soon at info points, carpool, no shift, please do not take photos
- Caren Barros joined the company in mid-May as an assembly employee and cleaner
- MOS production capacity utilization KW 17 = 131%, KW 16 = 106%, KW 15 = 139%, KW 14 = 125%
- MOS Welding productivity KW 17 = 94%, KW 16 112%, KW 15 =103%, KW 14 = 117%
- MOC production capacity utilization KW 17 = 79%, KW 16 = 83%, KW 15 =91%, KW 14 = 97%
- Open assembly orders 1,150 DG, 346 DK/LAN, 149 FL
- Official Holidays 2025 was supplemented with a branch office in Spain (MES), Bäumli
- Successful ISO 14001 certification, environmental management system
- Fiirobig meeting on 2.5.25, with our partner company Meyer Metall AG and photos of customer trip Thury
- Entry or transfer as of 1.9.25, Gerta Shala will switch to Sales ID after her apprenticeship
- MOS production capacity utilization KW 16 = 106%, KW 15 = 139%, KW 14 = 125%, KW 13 = 130%
- MOS Welding productivity KW 16 112%, KW 15 =103%, KW 14 = 117%, KW 13 = 105%
- MOC production capacity utilization KW 16 = 83%, KW 15 =91%, KW 14 = 97%, KW 13 = 100%
- Open assembly orders 1,150 DG, 498 DK/LAN, 224 FL
- Official start of the branch office in Spain (MES) on 01.05.25
- Vending machine fund dinner on 09.05.25, registration deadline Fri. 25.4.25
- MOS production capacity utilization week 14 = 125%, week 13 = 130%, week 12 = 127%, week 11 = 112%
- MOS Welding productivity week 14 = 117%, week 13 = 105%, week 12 = 114%, week 11 = 123%
- MOC production capacity utilization week 14 = 97%, week 13 = 100%, week 12 = 100%, week 11 = 84%
- Open assembly orders 3,800 DG, 749 DK/LAN, 270 FL
- 214th container to the USA will be loaded on Wed 9.4.25
- MOS production capacity utilization week 13 = 130%, week 12 = 127%, week 11 = 112%, week 10 = 95%
- MOS Welding productivity week 13 = 105%, week 12 = 114%, week 11 = 123%, week 10 = 107%
- MOC production capacity utilization week 13 = 100%, week 12 = 100%, week 84%, week 10 = 95%
- Open orders Assembly 2,250 DG, 415 DK/LAN, 350 FL
- Please only park in your allocated parking spaces.
- Probationary period passed: Andras Béres, Sales / Andreas Senn, Assembly / Aaron Schweizer, Welding
- Resignation: Sonja Beyeler as of 30.06.2025
Addition: please use a new form for the ideas mailbox
- MOS production capacity utilization CW 12 = 127%, CW 11 = 112%, CW 10 = 95%, CW 09 = 115%
- MOS Welding productivity week 12 = 114%, week 11 = 123%, week 10 = 107%, week 09 = 102%
- MOC production capacity utilization week 12 = 100%, week 11 = 84%, week 10 = 95%, week 09 = 99%
- Open assembly orders 1,100 DG, 509 DK/LAN, 97 FL
- Internal one-day internship for Aaron Schweizer (welding shop) in assembly, 27.3.25
- MOS production capacity utilization CW 11 = 112%, CW 10 = 95%, CW 09 = 115%, CW 08 = 102%
- MOS Welding productivity week 11 = 123%, week 10 = 107%, week 09 = 102%, week 08 = 108%
- MOC production capacity utilization week 11 = 84%, week 10 = 95%, week 09 = 99%, week 08 = 96%
- Open assembly orders 3,000 DG, 560 DK/LAN, 504 FL
- 213th container to the USA will be loaded on Wed 19.3.25
- Salary will be paid this month on Wednesday, 26.3.25
- MOS production capacity utilization CW 10 = 95%, CW 09 = 115%, CW 08 = 102%, CW 07 = 106%
- MOS Welding productivity week 10 = 107%, week 09 = 102%, week 08 = 108%, week 07 = 126%
- MOC production capacity utilization week 10 = 95%, week 09 = 99%, week 08 = 96%, week 07 = 96%
- Open assembly orders 1,00 DG, DK/LAN,
- Employees who process customer, employee or supplier data will receive
a training request from DATA Security Manager on 11.3.25
- Salary will be paid this month on Wednesday, 26.3.25
- MOS production capacity utilization CW 09 = 115%, CW 08 = 102%, CW 07 = 106%, CW 06 = 86%
- MOS Welding productivity week 09 = 102%, week 08 = 108%, week 07 = 126%, week 06 = 104%
- MOC production capacity utilization week 09 = 99R, week 08 = 96%, week 07 = 96%, week 06 84%
- Open assembly orders 1,200 DG, 270 DK/LAN, 237 FL
- Storage area ML06 will be closed, new in hall S MA06
- Andrea Karpati, Assembly, has passed the probationary period
- Resignation: Yannik Gabathuler as of 30.04.2025
- MOS production capacity utilization week 08 = 102%, week 07 = 106%, week 06 = 86%, week 05 = 76%
- MOS Welding productivity week 08 = 108%, week 07 = 126%, week 06 = 104%, week 05 = 86%
- MOC production capacity utilization week 08 = 96%, week 07 = 96%, week 06 84%, week 05 = 59%
- Open assembly orders 3,950 DG, 633 DK/LAN, 417 FL
- 212th container to USA will be loaded Wed 26.02.25, 49th container to Canada on Fri 28.02.25
- Internal audits MOC Wed 05.03.2025, MOS Thu 10.04.2025
- External audits MOC Fri 11.04.2025, MOS 23.04.2025
- Entry assembly: per 01.03.2025 Levis Wanjiru
- MOS production capacity utilization week 07 = 106%, week 06 = 86%, week 05 = 76%, week 04 = 75%
- MOS Welding productivity week 07 = 126%, week 06 = 104%, week 05 = 86%, week 04 = 102%
- MOC production capacity utilization week 07 = 96%, week 06 84%, week 05 = 59%, week 04 = 65%, week 03 = 63%
- Wed 19.02.2025 Break talks assembly/welding shop will be postponed (AbtL/GrL sickness absences)
- Fri 21.02.2025, test drillings will be carried out by Weber AG in building A from 2.30 pm, noise pollution
- Sat 22.02.2025, IT server update from 9.00 am
- Leaving Logistics: As of 30.04.2025 Denis Bettineschi
- MOS production capacity utilization CW 06 = 86%, CW 05 = 76%, CW 04 = 75%, CW 03 = 78%
- MOS Welding productivity week 06 = 104%, week 05 = 86%, week 04 = 102%, week 03 = 115%
- MOC production capacity utilization week 06 84%, week 05 = 59%, week 04 = 65%, week 03 = 63%, week 02 = 80%
- Open assembly orders 3,200 DG, 589 DK/LAN, 417 FL
- Attention children at Lindenhof, please drive carefully/slowly
- The 2025 vacation planning has been completed and released
- MOS production capacity utilization week 05 = 76%, week 04 = 75%, week 03 = 78%, week 02 = 86%
- MOS Welding productivity week 05 = 86%, week 04 = 102%, week 03 = 115%
- MOC production capacity utilization week 05 = 59%, week 04 = 65%, week 03 = 63%, week 02 = 80%
- Open assembly orders 2,150 DG, 395 DK/LAN, 203 FL
- 211th container to USA will be loaded on Wed 5.2.25, 212th container on 26.2.25
- Current organizational chart as of 1.2.25, soon at the Infopoints
- Break talks, MA survey in CW 7+8, see schedules of the departments and times at info points
- MOS production capacity utilization week 04 = 75%, week 03 = 78%, week 02 = 86%, week 51 = 49%
- MOS Welding productivity week 04 = 102%, week 03 = 115%
- MOC production capacity utilization week 04 = 65%, week 03 = 63%, week 02 = 80%, week 51 = 74%
- Open installation orders 1'600 DG, 350 DK/LAN, 282 FL
- Break talks, information/results of MA survey in CW 7 and CW 8, allocations soon at info points
- 50th container to Australia is expected to be loaded on Fri. 31.01.25
- Entry temporary assembly employee as of 04.02.2025, Benjamin Ramel
- Tue 28.01.25 from 16.30, Building A, all MA Clean Desk (confidential matters, supply drawings), measurement of office space by Schällibaum AG
- MOS production capacity utilization week 03 = 78%, week 02 = 86%, week 51 = 49%, week 50 = 63%
- MOS Welding productivity week 03 = 115%
- MOC production capacity utilization week 03 = 63%, week 02 = 80%, week 51 = 74%, week 50 = 84%
- Open installation orders 1'350 DG, 246 DK/LAN, 188 FL
- In January, check payroll accounting
- Goals 2025 are available at info points and on the Bäumli
- Coffee fund dinner on Fri 09.05.2025 from 16.00 hrs
- Entry as of 01.02.2025, Marko Milankovic, evening shift management
- MOS production capacity utilization week 02 = 86%, week 51 = 49%, week 50 = 63%, week 49 = 62%
- MOC production capacity utilization week 02 = 80%, week 51 = 74%, week 50 = 84%, week 49 = 99%
- Open installation orders 3'860 DG, 816 DK/LAN, 357 FL
- 210th container to USA will be loaded on Wed 15.01.25
- Denis Bettineschi now supports the janitor team on Mon and Tue afternoons
- Until 17.1.25, enter vacations up to and including autumn via workflow or absence slip!
- ASGA Pension Fund/BVG, new pension certificate 2025 was sent by post
- MOS production capacity utilization week 51 = 49%, week 50 = 63%, week 49 = 62%, week 48 = 68%
- MOC production capacity utilization week 51 = 74%, week 50 = 84%, week 49 = 99%, week 48 = 79%
- Open installation orders 1,100 DG, 353 DK/LAN, 510 FL
- MOS production capacity utilization week 50 = 63%, week 49 = 62%, week 48 = 68%, week 47 = 66%
- MOC production capacity utilization week 50 = 84%, week 49 = 99%, week 48 = 79%, week 47 = 96%
- Open installation orders 1,600 DG, 400 DK/LAN, 660 FL
- Inventory raw material on Tue 17.12. + Wed 18.12.24
- Matthias Rüegg moves to the testing workshop (E&K) as of 01.01.2025
- Joined on 01.01.25, Aaron Schweizer, welding shop
Addendum:- Probationary period passed, Rita Hedley administration and Etienne Boucher sales
- MOS production capacity utilization week 49 = 62%, week 48 = 68%, week 47 = 66%, week 46 = 85%
- MOC production capacity utilization week 49 = 99%, week 48 = 79%, week 47 = 96%, week 46 = 101%
- Open orders Assembly 987 DG, 237 DK/LAN, 149 FL
- Inventory cellar on Mon 9.12. + Tue 10.12.24, inventory assembly Thu 12., Fri 13. + Mon 16.12.24
- Be careful with material displacements with elevator building C, inner door must be repaired
- From 1.1.25, child and education allowances will be slightly increased
- Fabienne Rieben moves to Internal Sales as a trainee from 6.1.25 until spring
- Interested parties for internal English courses every Monday 16.05 - 16:50, registration at the secr.
- MOS production capacity utilization week 48 = 68%, week 47 = 66%, week 46 = 85%, 45 = 80%
- MOC production capacity utilization week 48 = 79%, week 47 = 96%, week 46 = 101%, week 45 = 97%
- Open assembly orders 3,300 DG, 484 DK/LAN, 127 FL
- Inventory welding shop on Thu 5.12. + Fri 6.12.24
- Inventory cellar on Mon 9.12. + Tue 10.12.24, orders until late Fri 6.12., 12 noon. Fri 6.12., 12 noon
- Isa Rieben goes to Australia and supports MAU from 7.1.25 - 28.3.25
- Resignation of Omar Sacchet on 31.12.24, followed by sporadic interim assignments
- MOS production capacity utilization week 47 = 66%, week 46 = 85%, 45 = 80%, week 44 = 94%
- MOC production capacity utilization week 47 = 96%, week 46 = 101%, week 45 = 97%, week 44 = 85%
- Open orders Assembly 1,300 DG, 250 DK/LAN, 70 FL
- Inventory MAU Thu 28.11. and Fri 29.11.24
- Christmas party Registrations until Fri 29.11.24 to the secretary's office
- MOS production capacity utilization week 46 = 85%, 45 = 80%, week 44 = 94%, week 43 = 85%
- MOC production capacity utilization week 46 = 101%, week 45 = 97%, week 44 = 85%, week 43 = 101%
- Open assembly orders 3,300 DG, 665 DK/LAN, 221 FL
- 49th container to Australia will be loaded on Wed 20.11.24
- Entry Assembly, 01.01.25 Andrea Karpati and 01.01.25 Andreas Senn, Group Manager
- Entry Sales, 01.01.25 Andras Béres
- Resignation Manufacturing, 22.11.24 Marino Cecchinato
- Probationary period passed, 3 apprentices, Soraya, Almedin and Conor and Jonathan in production
- MOS production capacity utilization week 45 = 80%, week 44 = 94%, week 43 = 85%, week 42 = 89%
- MOC production capacity utilization week 45 = 97%, week 44 = 85%, week 43 = 101%, week 42 = 93%
- Open assembly orders 1,200 DG, 371 DK/LAN, 50 FL
- 48th container to Canada will be loaded on Fri 15.11.24
- MOS 2025 general catalog has arrived
- Initial audit ISO 14001, review of documents was successful
- Inventory MOC Warehouse, Tue 12.11. and Wed 13.11.24
- Many thanks for the patient employees on Thu 7.11.24, transport company of the second-hand machine was late, entrance to underground parking garage partially blocked
- MOS production capacity utilization week 44 = 94%, week 43 = 85%, week 42 = 89%, week 41 = 68%
- MOC production capacity utilization week 44 = 85%, week 43 = 101%, week 42 = 93%, week 41 = 89%
- Open assembly orders 1,400 DG, 543 DK/LAN, 70 FL
- Last massage in 2024, 11-26-24 / start in 2025, 01-15-25
- Who is interested in personalized hearing protection / earplugs? For an order through MOS, there must be 10 orders. MOS will pay CHF 100, please contact Ernst Schenk by mid-November.
- Wed 11-06-24, Initial audit ISO 14001, morning
- Thu 11-07-24, 8-11.30 a.m., Occasions machine is loaded in front of forecourt D, smokers please all go to the roof terrace during the break.
- MOS production capacity utilization week 43 = 85%, week 42 = 89%, week 41 = 68%, week 40 = 67%
- MOC production capacity utilization week 43 = 101%, 42 = 93%, week 41 = 89%, week 40 = 80%
- Open orders Assembly 1,000 DG, 479 DK/LAN, 88 FL
- 208th container to USA will be loaded on Wed 30.10.24
- Temporary assembly worker, for the next few weeks, Senathirajah Senpagavarathan
- Public holidays and bridging days 2025 in Bäumli and at info points
- Who is interested in personalized hearing protection/plugs? For an order through MOS, there must be 10 orders. MOS will pay CHF 100, please contact Ernst Schenk by mid-November.
- MOS production capacity utilization week 42 = 89%, week 41 = 68%, week 40 = 67%, week 39 = 65%
- MOC production capacity utilization week 42 = 93%, week 41 = 89%, week 40 = 80%, week 39 = 84%
- Open orders Assembly 1,250 DG, 309 DK/LAN, 88 FL
- Thu 11-14-24 National Future Day, please register interested children, including those of friends, with Céline by 10-31-24
- After working meeting exceptionally on Thursday, 10-31-2024, before All Saints Day, incl. short travel report by Thuri
- MOS production capacity utilization week 41 = 68%, week 40 = 67%, week 39 = 65%, week 38 = 72%
- MOC production capacity utilization week 41 = 89%, week 40 = 80%, week 39 = 84%, week 38 = 68%
- Open orders Assembly 1'250 DG, 400 DK/LAN, 81 FL
- Sat 19.10.24 the server will be maintained, please report if something conspicuous on Monday
- Thu 14.11.24 National Future Day, please register interested children, including those of friends, with Céline by 31.10.24
- MOS production capacity utilization week 40 = 67%, week 39 = 65%, week 38 = 72%, week 37 = 72%
- MOC production capacity utilization week 40 = 80%, week 39 = 84%, week 38 = 68%, week 37 = 71%
- Open orders Assembly 850 DG, 400 DK/LAN, 168 FL
- New organization chart is hanging at the info points and is filed in the Bäumli
- Lino S. will be doing his MOC trainee assignment from 14.10. - 06.12.24, commissioning machine 56 etc.
- MOS: Production capacity utilization CW39 = 65% (CW38 = 72%, CW37 = 72%, CW36 = 76%)
- MOC: Production capacity utilization CW39 =82% (CW38 =68%, CW37 = 71%, CW36 = 72%)
- 40 foot container USA 207 will be loaded on Wednesday, 10-02-24
- MOS production capacity utilization week 38 = 72%, week 37 = 72%, week 36 = 76%, week 35 = 79%
- MOC production capacity utilization week 38 = 68%, week 37 = 71%, week 36 = 72, week 35 = 71%
- Open orders Assembly 2'500 DG, 512 DK/LAN, 236 FL
- Wed 09-25-24 the container is loaded to Australia
Addendum:
Fixed-term employment contract of Gennaro C., Production, expires on 30.09.2024.
- MOS production capacity utilization week 37 = 72%, week 36 = 76%, week 35 = 79%, week 34 = 78%
- MOC production capacity utilization week 37 = 71%, week 36 = 72, week 35 = 71%, week 34 = 71%
- Open orders Assembly 650 DG, 337 DK/LAN, 147 FL
- Wed 09-18-24 the container is loaded to Canada
- Canteen credit rail from the Fit4work and Bike to Work campaign, redeem by 30.09.24, expires afterwards
- There is now a loyalty bonus for a 15-year service anniversary
- Resignation effective 16.9.24, Semir Sabotic, Assembly
- MOS production capacity utilization week 36 = 76%, week 35 = 79%, week 34 = 78%, week 33 = 63%
- MOC production capacity utilization week 36 = 72, week 35 = 71%, week 34 = 71%, week 33 = 71%
- Open orders Assembly 1,000 DG, 269 DK/LAN, 49 FL
- Tue 09-10-24 Online employee survey by icommit begins
- Thu 09-12-24, ISO 14001 (environmental management), with Ensa Consulting and Quality, before training
- Change of function as of 09-01-24, Caty Rieben, new Sales Team Leader
Addendum:- Resignation effective 16.09.2024, Semir Sabotic, last working day, Thu 12.09.24
- Wed 09-04-24 the 206th container is loaded for the USA
- MOS production capacity utilization week 35 = 79%, week 34 = 78%, week 33 = 63%, week 32 = 72%
- MOC production capacity utilization week 35 = ??%, week 34 = 71%, week 33 = 71%, week 32 = 96%
- Open assembly orders 3,000 DG, 970 DK/LAN, 285 FL
- Start of new English course from Monday, 09-09-24, see Infopoints
- Fri. 09-06-24, between 07:00 - 10:00 a.m. machine #56 is loaded for the USA.
- There may be obstructions to access to the underground parking garage / outdoor parking spaces of building D and the bridge.
- Tue 09-10-24 Online employee survey by icommit begins
- Production capacity utilization week 34 = 78%, week 33 = 63%, week 32 = 72%, week 31 = 40%
- Open orders Assembly 600 DG, 456 DK/LAN, 148 FL
- Please ensure that the toilets are as clean as you would like them to be
- Wed Sept 4th, 2024 Silvia Baumann starts again after maternity leave, 40%
- Fri Sept 6th, 2024, between 06:30- approx. 10:00 a.m. the machine #56 will be loaded for the USA
- Tue Sept 9th, 2024, fire extinguisher training for all, note the schedule/times, info points
- Claudio Stäheli, Sales, has passed the probationary period
- Production capacity utilization week 33 = 63% (week 32 = 72% week 31 = 40%, week 30 = 83%)
- Open orders Assembly 880 DG, 240 DK/LAN, 139 FL
- Fit4Work, 1st and 2nd week of September, free apples during break/lunch in the canteen
- Wed 18.09.24, Volleyball with Nati A Team, please register in the list, Infopoints
- Thu 19.09.24, Cybercrime training, note the schedule/times, info points
- 24.09. and 26.09. in the afternoon, career orientation Toggenburg for 2nd year students
- Joined 01.09.2024, Marino Cecchinato, Polymechanic, Production
- The 47th container to the AUS will be loaded on Tuesday 13.8.24
- Production capacity utilization week 32 = 72% (week 31 = 40%, week 30 = 83%, week 29 = 85%)
- Open orders Assembly 1.600 DG, 650 DK/LAN, 160 FL
- Please notify the secretary's office by Friday 16.08. of registration/cancellation for the barbecue
- The 205th container to the USA will be loaded on Wed 7.8.24
- Production capacity utilization week 31 = 40%, week 30 = 83%, week 29 = 85%, week 28 = 77%
- Open orders Assembly 2,300 DG, 350 DK/LAN, 300 FL
- New e-mail address : logistik@mosmatic.com (Önder+Denis)
- Omar Sacchet has passed his probationary period
- Entry: 01.09.2024, Fabienne Rieben, Trainee
- Production capacity utilization week 29 = 85%, week 28 = 77%, week 27 = 78%, week 26 = 106%
- Open orders Assembly 1,000 DG, 142 DK/LAN, 138 FL
- Entry: 19.08.2024 Semir Sabotic, Group Leader FL Assembly
- Entry: 01.10.2024 Rita Hedley, GM/GL Assistant at 60%
- Canteen remains closed from 01.08. - 18.08.2024
- The 204th container to the USA will be loaded on Wed 07-17-2024
- Production capacity utilization week 28 = 77%, week 27 = 78%, week 26 = 106%, week 25 = 92%
- Open assembly orders 2,600 DG, 330 DK/LAN, 290 FL
- In week 30 - 31 no shift work in production
- The 204th container to USA will be loaded on Wed 07-17- (was postponed)
- Production capacity utilization week 27 = 78%, week 26 = 106%, week 25 = 92%, no morning shift until further notice
- Open orders Assembly 500 DG, 290 DK/LAN, 347 FL
- Resignation of Mirweis Nabizadeh, effective 07-19-2024
- Production capacity utilization week 26 = 106%, week 25 = 92%, week 24 = 98% no morning shift until further notice
- Open orders Assembly 2,000 DG, 640 DK/LAN, 443 FL
- Badge problems/malfunctions at the front personnel entrance and rear sliding door during production
- Tuesday, 09-10-2024 there will be a fire extinguisher training course for everyone
- Resignation of Okan Demirci as of 08-02-2024
- Resignation of Dominic Aerne as of 08-31-2024
- 203rd container to USA will be loaded on Wed 26.6.
- Production capacity utilization week 25 = 92%, week 24 = 98%, week 23 = 112% no morning shift until further notice
- Tue 25.6. and Wed 26.6., stocktaking MOC (production, assembly, distribution)
- Open assembly orders 3,000 DG, 790 DK/LAN, 550 FL
- Thu 27.6., 9.00 a.m. during the break, end-of-apprenticeship congratulations in the canteen, incl. snack
- 203rd container to USA will be loaded on Wed 19.6.
- Production capacity utilization week 24 = 98%, week 23 = 112%, week 22 = 121%, no morning shift until further notice
- Privacy policy for employees, to be viewed on the Bäumli or collected from HR
- Tue 18.6. and Wed 19.6., Inventory MOC (Warehouse)
- English, new internal course from 9.9.24, registration until 12.8.24 at the secretary's office
- Canteen and washing up will remain closed from 1 - 16.8.24, use your own crockery and cutlery
- Open orders Assembly 1,000 DG, 650 DK/LAN, 195 FL
- Wed 19.6.24 13.00 Photo shoot for apprentices, followed by apprentice outing
- 46th container to Canada will be loaded on Wed 12.6. and to Australia on Fri 14.6.24
- Re-certification “Known consignor”, import/export
- Production capacity utilization week 23 = 112%, week 22 = 121%, week 21 = 116%, week 20 = 123%
- Tue 11.6. and Wed 12.6., Inventory MCA
- Sat 15.6.24, we are represented at Toggenburg Apprenticeship Forum in the Markthalle Wattwil, panel discussion with Erich B. from 8.30 - 9.00 am in the outdoor tent
- Fri 21.6.24, excursion Köbelisberg from 1 to 5 p.m., flyer to follow
- Open assembly orders 1,600 DG, 296 DK/LAN, 106 FL
- We also receive re-certification for MOC
- Production capacity utilization week 22 = 121%, week 21 = 116%, week 20 = 123%, week 19 = 119%
- Due to the mix of parts, we have reached peak capacity utilization in production
- Deliveries this week, of around 3'500 pcs. DG, 430 DK/LAN, 120 FL
- We receive recertification in accordance with ISO 9001:2015
- 202nd container to USA will be loaded on Wed 05-29-24
- Production capacity utilization week 21 = 116%, week 20 = 123%, week 19 = 119%, week 18 = 105%
- There will be a national occupational reform in the technical apprenticeships at the start of 2026
- Resignation; Numan Kocabas Polymechanic apprentice as of 05-31-2024
- Production capacity utilization week 20 = 123% (without MS), week 19 = 119% (without MS), week 18 = 105% (without MS), week 17 = 97% (without MS)
- Wed 05-22-24, bridge to the welding shop is being repaired, possibly minor restrictions
- Sat 05-25-24, Server maintenance and updates (IT)
- Mon 05-27-24, ISO recertification audit
- Production capacity utilization week 18 105% (without MS), week 17 97% 8without MS), week 16 107% (without MS), week 15 66% (without MS)
- Lars R. will start his MOC assignment at the end of May until the beginning of July (6 weeks). Introduction of BDE and other projects
- Hall S, telephone no. 179
- Hall S, 73 pallets are already in storage
- New organizational chart is posted
- Production capacity utilization week 17 97% 8without MS), week 16 107% (without MS), week 15 66% (without MS), week 14 47% (without MS)
- 201st container to USA is expected to be loaded on Mon 06.05.24
- Paper collection on Tuesday 07.05.
- Waste containers will not be emptied on Thursday 09.05., only again on 16.05.
- Gertrud Huber has passed the probationary period
- Production capacity utilization week 16 107% (without MS), week 15 66% (without MS), week 14 47% (without MS), week 13 53% (without MS)
- Employees who are unable to attend the ceremony on Friday, 26.04. should collect the information from their line manager afterwards
- Hall S: The first pallets have moved into Hall S
- Production capacity utilization week 15 66% (without MS), week 14 47% (without MS), week 13 53% (without MS), week 12 59% (without MS)
- 200th container to USA, on Wed 17.4.24
- From Thu 18.4.24, MOS clothing, issue per department
- Fri 26.4.24, 3.00 p.m., all employees Tour/set-up of Hall S
- Salary payment April, on Fri 26.4.24
- Entry: Mirweis Nabizadeh, assembly employee, as of 22.4.24
- Production capacity utilization week 14 47% (without MS), week 13 53% (without MS), week 12 59% (without MS), week 11 97% (without MS)
- MOS Internal audit Mon 15.4.24 by Ms. Engler
- MOC Internal Audit Fri 19.4.24
- Hall S: Acceptance of electrical installation okay and solar system running at full power
- Resignation: Elvis Corovic is leaving us as of 31.05.24
- Production capacity utilization week 13 53% (without MS), week 12 59% (without MS), week 11 97% (without MS), week 10 62% (without MS)
- 45th container to Australia will be loaded on Friday 05.04.2024
- Probationary period passed: Romina Graf and Isa Rieben
- Resignation: Cynthia Lörli is leaving us as of 30.04.2024
- Production capacity utilization week 12 59% (without MS), week 11 97% (without MS), week 10 62% (without MS), week 09 66%, (without MS)
- Production mechanic apprentice joins: Conor Schönenberger as of 05.08.2024
- Resignation: David Raschle is leaving us as of 31.05.2024
- Production capacity utilization week 11 97% (without MS), week 10 62% (without MS), week 09 66%, (without MS), week 08 59% (without MS)
- Fri April 26th, 24, 3.00 p.m., all employees Tour/erection of Hall S, incl. aperitif
- Production capacity utilization CW 10 62% (without MS), CW 09 66% (without MS), CW 08 59% (without MS), CW 07 55% (without MS)
- 199th container to USA will be loaded on Wednesday March 12th, 2024
- Hall S: The power line will be connected to the grid this week
- Production capacity utilization CW 09 66% (without MS), CW 08 59% (without MS), CW 07 55% (without MS), CW 06 52% (without MS)
- 45th container to Canada will be loaded on Tue March 5th, 2024
- New group e-mail address: technischedienste@mosmatic.com, for janitor, building services and machine maintenance
- On Sat March 9th, 2024, new OL update
- Entry KV apprentice: Soraya Mikic as of August 5th, 2024
- Production capacity utilization weeek 08 59% (without morning shift), week 07 55% (without morning shift), w. 06 52% (without MS), w. 05 59% (without MS)
- The morning shift in production is also canceled in March
- Ken Schuenemann USA, will visit production and QA in week 10
- New production office workstations; Erich and Elsan office tool issue, training workshop; Stefan G., Röbi, Marco R.
- Swap office workstations AVOR/welding shop; Adrian in AVOR / Enrico in welding shop
- Current organization chart incl. technical services, as of 01.02.2024, at info points and on Bäumli
- Early resignation: Roland Bochsler as of 31.03.24
- Eintritt USA: Christopher Burton, Assembly, per 26.02.2024
- Production capacity utilization week 07 55% (without morning shift), w. 06 52% (without MS), w. 05 59% (without MS), w. 04 68%
- 45th collection container to Canada
- There is now 1 fire blanket in the welding department
- The windows in building A will be cleaned in the next few days
- Robin Manser has passed the probationary period
- Enrico Ladewig becomes the new Welding Group Manager as of 1.4.24
- Jorge Aznar, will reduce his workload to 20% as of 1.3.24
- Entry: Claudio Stäheli, Sales Field Service, as of 1.6.24
- Production capacity utilization week 06 52% (without morning shift), week 05 59% (without morning shift), week 04 68%, week 03 65%
- 198th container to USA loaded on Wed 14.2.24
- 44th consolidated container to Australia will be loaded, probably on Wed 14.2.24
- Successful registration of the Mosmatic brand in China
- Ski day of 24.2.24 is unfortunately canceled due to lack of participants
- New Blueteam line-up from 1.5.24, according to information from the summit meeting
- Resignation: Roland Bochsler, Welding Shop Manager, as of 30.04.2024
- Production capacity utilization week 05 59% (without morning shift), week 04 68%, week 03 65%, week 02 71%
- Smokers: Please use the ashtray everywhere (also for the ashes).
- Ski day on 24.2.24 still too few registrations, please register all participants again by 9.2.24, otherwise it may be canceled.
- Vacation requests arriving too late (late 8.2.24) must be adjusted.
- Production capacity utilization CW 04 68%, CW 03 65%, CW 02 71%, CW 01 34%
- Please enter all the bridge days/company vacations
- Vacation release by 09.02.2024 at the latest
- Production capacity utilization CW 03 65%, CW 02 71%, CW 01 34%, CW 51 -%
- 197th container to USA will be loaded on Wed January 24th, 2024
- Official public holidays and bridging days posted on the info board and in the Bäumli
- New payroll layout, the January salary envelope also contains the 2023 salary statement
- After-work beer in the canteen on Fri 01-26-2024
- New entry Trudi Huber, Canteen MA, 20% from 02-01-24
- Production capacity utilization week 02 71%, week 01 34%, week 51 -%, week 50 22%
- Enter vacation requests (incl. MOS company vacations and bridging days) by 19.01.2024
- On 22.01.+23.01.24 a frame pallet is placed in front of the office for sale, old confidential files are then disposed of in Bazenheid
- Production capacity utilization week 01 34%, week 51 -%, week 50 22%, week 49 41%
- On 22.01.+23.01.24 a frame pallet is placed in front of the office for sale, old confidential files are then disposed of in Bazenheid
- Badge terminal assembly and production, will be replaced on Wednesday, 10.1.24 between 8-11 am. Use another terminal in case of emergency.
- Gennaro Candido has passed his probationary period